|
Wilmar Port Thilawa Phase 3 (Road & Drain) |
We supply Resource Group of Construction for Thilawa Wilmar international port road & drain project 2021. The Stones Specification are 6*9, 2*4, 0-10 mm, 5-10mm .Thanks our valuable client still support us in this special situation.
|
Wilmar Port Thilawa Phase 3 (Road & Drain) |
|
Wilmar Port Thilawa Phase 3 (Road & Drain) |
|
Wilmar Port Thilawa Phase 3 (Road & Drain) |
|
Wilmar Port Thilawa Phase 3 (Road & Drain) |
|
Wilmar Port Thilawa Phase 3 (Road & Drain) |
|
Wilmar Port Thilawa Phase 3 (Road & Drain) |
Myanma Kong Hua Port : PLOT NO-37, KONG HUA JETTY, THILAWA,YANGON,MYANMAR. konghuaport@gmail.com Phone: +95 9400800158, +95 9400800198 Viber: +95 9400800198
Farmers are rarely expected to be experts in hydrology and drainage. However, they need to at least learn the basics to keep their fields from flooding and to control erosion around irrigation systems and farm roads. Drainage systems, both surface and subsurface designs, are essential for carrying away irrigation and fertigation water that is high in nutrients, chemicals, and other contaminants. Proper slope and volume capacity creates a clear path for all waste water to flow away from the fields and to holding ponds or other processing areas. brickwork preston
ReplyDelete